12-01-2017
Today our plumber Jerry and his brother Ron came to rough in the plumbing at cabin #5. As this was an existing cabin, they will need to cut a few holes in the sub-floor and fish the water and gas lines under the cabin. Keith, Travis and Justin are also here working on the cabin. Drain pipe and water lines for the kitchen sink.
It’s a pretty tight space to work in between cabins #5 & 6!
Justin applies the moisture barrier on the lakeside cabin wall where the deck will be built.
Is Keith showing us how large the hole has to be for the door or how big the fish was that he almost caught!?